Floor Plan - Power


Checklist

  1. Coordinate with Architectural Floor Plan.
    1. Layout shall agree with Architectural Drawings.
  2. Indication of North.
  3. "Drawing Title Designation" for Floor Plan.
  4. Reference items on Power Plans to the details of these items appearing on other sheets.
  5. Include a note to read: "See Sheet __ (Information Sheet) for clarification of Symbols used." List any additional Symbols on Electrical Sheets.
  6. Column Reference Grids.
    1. Coordinate with Architectural Floor Plans.
  7. Room Names and Numbers.
    1. Coordinate with Architectural Floor Plans.
  8. Indicate all Receptacles, Telephone Outlets, Special Outlets, etc. and all Power and Switching to Fans, Air-conditioning Units, Pumps, Electrical Water Coolers, Air Volume Boxes, etc ..
  9. Use "Reference Designations" (hexagons) for repetitive items with a legend of "Clarification of Reference Designations."
  10. Horizontally dimension all electrical devices which require specific locations such as Floor Outlets, Outlets which relate to specific room arrangements, etc.
  11. Indicate mounting height of Outlets and Devices which require mounting heights to conform with specific functions.
    1. Coor-dinate mounting heights with Millwork arrd Casework Details.
    2. Mount Duplex Receptacles horizontally above Millwork, Casework, etc.
  12. Clearly indicate Electrical and Telephone Conduit run .under slabs, in slabs, in walls, above ceilings, etc.
  13. Indicate Outlets in Corridors for cleaning machines.
  14. Indicate Exterior Weatherproof Outlets with mounting height and installation detail.
    1. Coordinate location of Power Panels with Lighting Panels, Emergency Panels, etc. and coordinate with Panelboard Schedules.
    2. Verify space allotted for Panels is, in reality, sufficient to accommodate Panels.
  15. Verify requirements of telephone company and special electrical functions.
  16. Power for future expansion.
  17. Elevator, Escalator, and Pit requirements.
    1. Coordinate with Elevator specifications.
  18. Electrical power to Doors and Devices with electronic hardware or power operation.
    1. Coordinate with Hardware Specifications.
  19. Indicate how Mechanical Flow Meters are to be wired to perform specific functions.
  20. Coordinate with "Irrigation Drawings" for power to Automatic Controller.

results matching ""

    No results matching ""